Starbank UK

Description

BBSM was challenged with replacing an existing worn out ESP and chose an electrofilter from NILATEK to replace it. The filter was installed in December 2025.

Data

Fuel : Wood byproduct from production, < 10% Water
Installed : 2025
Dust before : TBD mg/Nm3 @ 6%O2
Dust after : TBD mg/Nm3 @ 6%O2